| Works
from Monday 14th April 2003 |
| --------------------------------- |
 |
A38 |
Star.
Between Rowberrow Lane and the County Boundary. Installation
of crash barrier completed. Contractor will be returning to site
to provide access onto public footpath for one week. Traffic management
will only be in place outside of peak flows 9.30 to 15.30.
|
 |
B3139 |
Blackford
Road, Mark, B3139 Pilcorn Street and Latcham, Wedmore, B3139 Panborough
Road, Theale, West Road, Lympsham and Perry Green, Wembdon.
Carriageway patching works in advance of next years surface dressing
season. Traffic light control on B3139. |
 |
|
Fairfax
Road/Weacombe Road, Bridgwater Providing dropped
crossing facilities. |
 |
|
Watery
Lane and Clare Street, North Petherton Provision
of dropped crossing facilities |
 |
|
Broadlands
Avenue, North Petherton Surface water drainage. |
 |
|
Townsend
Road, Wedmore Surface water drainage. |
 |
|
Chilton
Polden Moor Bridge, over South Drain
Bridge strengthening works continue until the end of May 2003.
Works are being carried out under a Temporary Road Closure
|
 |
|
Whitehouse
Bridge, White House Lane, East Brent
This scheme is progressing well now that the arch is stabilized
and a method has been devised for dealing with the river water.
The completion date should be around the end of April 2003. An extension
of the Temporary Road Closure will be applied for should the completion
date slip into early May 2003
|
 |
A361 |
Greylake
Culvert, Moorlinch
Parapet repairs and safety fencing. Works programmed for a further
five weeks involving single lane traffic control working
|
| -----------Western
Power Distribution-------- |
| |
|
Nothing
to report |
| -----------Bridge
Refurbishment Works-------- |
|
|
Nothing to report |
| ------------TRANSCO--------- |
| |
|
Nothing to
report |
| ----------Wessex
Water-------- |
 |
|
Bridgwater
Main relining works continue in A39 Bath Road.
The first phase is working from Cross Rifles roundabout to 167 Bath
Road. Single lane traffic control working as works progress over
the railway bridge. This phase is programmed for completion before
Easter. PR being undertaken with Bridgwater College.
Phase 2 will then commence Monday 28 April 2003 working from 167
Bath Road to Bower Lane. Duration of phase 2 is three weeks with
traffic lights being used where necessary
|
 |
A38 |
North
Petherton Mains rehabilitation work along the A38,
working from North Petherton towards Bridgwater terminating at Kerland
Clinic. Single lane traffic light control will be necessary where
minimum width for two way flow cannot be achieved
|
 |
|
Sparrow
Hill Way, Weare Installation of a first time sewerage
scheme under a temporary road closure. Scheme originally advertised
as commencing Monday 3 March 2003 has been re-programmed to commence
22 April 2003 with a completion date of 15 August 2003. Wessex will
be carrying out further consultation with frontagers |
 |
|
NEW
DEVELOPMENT, MIDDLE STREET, PURITON Construction
of foul and surface water sewer works to service new development.
Works continue for a further three weeks under aTemporary Road Closure |
| ----------Environment
Agency-------- |
| |
|
Nothing to report |
| ----------Cable
& Wireless-------- |
|
|
Nothing
to report |
| ----------TYCOM-------- |
|
|
Nothing to report |
| ----------TreeFelling-------- |
|
|
Nothing to report |
| ----------SWEB-------- |
| |
|
Nothing
to report
|
| ----------BT-------- |
| |
|
Nothing
to report
|
|
|
|
|
|
|